Test Post for WordPress

This is a sample post created to test the basic formatting features of the WordPress CMS.

Subheading Level 2

You can use bold text, italic text, and combine both styles.

  1. Step one
  2. Step two
  3. Step three

This content is only for demonstration purposes. Feel free to edit or delete it.

Test Post for WordPress

This is a sample post created to test the basic formatting features of the WordPress CMS.

Subheading Level 2

You can use bold text, italic text, and combine both styles.

  1. Step one
  2. Step two
  3. Step three

This content is only for demonstration purposes. Feel free to edit or delete it.

Test Post for WordPress

This is a sample post created to test the basic formatting features of the WordPress CMS.

Subheading Level 2

You can use bold text, italic text, and combine both styles.

  1. Step one
  2. Step two
  3. Step three

This content is only for demonstration purposes. Feel free to edit or delete it.

Metropolitan Pima Alliance Honors Collaborative Projects

2021 Common Ground Awards

Valencia Road Extension, Houghton Road to Old Spanish Trail

The Valencia Road extension was the result of public-private partner-ship between Rocking K Development, a subsidiary of Diamond Ventures, and Pima County.  Psomas led the planning design and construction management of the project, while KE&G Construction, Inc. was responsible for the construction of nearly three miles of new two-lane roadway, including a new bridge, a grade control structure and bank protection at the Pantano Wash. This new road also required extensive acquisition of private property and state land easements.  The design and construction teams worked extensively with the Vail School District.